Bergström, M and Stehn, L (2005) Benefits and disadvantages of ERP in industrialised timber frame housing in Sweden. Construction Management and Economics, 23(08), 831-8.

Bonnal, P, Gourc, D, Hameri, A-p and Lacoste, G (2005) A linear-discrete scheduling model for the resource-constrained project scheduling problem. Construction Management and Economics, 23(08), 797-814.

  • Type: Journal Article
  • Keywords: Construction scheduling; linear scheduling; optimization
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446190500040869
  • Abstract:

    For some specific types of construction projects, the classical CPM or PDM scheduling techniques are not the most suitable. Few specific scheduling approaches have been developed to cope with construction projects that are made of either repetitive activities or activities with linear developments. But real-world construction projects do not consist only of such activities. They are generally made of a mixture of linear and/or repetitive activities and of more conventional activities. To allow this, the linear scheduling problem is reformulated, so classical schedule calculation approaches can be used. The implementation of some Allen’s algebra features to avoid adverse discontinuities and to allow crew/work continuity, together with a resource-driven and space-constrained scheduling are among the key features of the proposed approach. It is also a spin-off of off-the-field practices used for scheduling real projects in the particle accelerator construction domain; an excerpt from such a construction project is provided for illustrating the methodology.

Bröchner, J, Josephson, P-e and Alte, J (2005) Identifying management research priorities. Construction Management and Economics, 23(08), 793-6.

Gangwar, M and Goodrum, P M (2005) The effect of time on safety incentive programs in the US construction industry. Construction Management and Economics, 23(08), 851-9.

Ivory, C (2005) The cult of customer responsiveness: is design innovation the price of a client-focused construction industry?. Construction Management and Economics, 23(08), 861-70.

Kadefors, A (2005) Fairness in interorganizational project relations: norms and strategies. Construction Management and Economics, 23(08), 871–8.

Larsen, G D (2005) Horses for courses: relating innovation diffusion concepts to the stages of the diffusion process. Construction Management and Economics, 23(08), 787-92.

Low, S P and Min, W (2005) Just-in-time management in the ready mixed concrete industries of Chongqing, China and Singapore. Construction Management and Economics, 23(08), 815-29.

Myers, D (2005) A review of construction companies' attitudes to sustainability. Construction Management and Economics, 23(08), 781-5.

Zayed, T M, Halpin, D W and Basha, I M (2005) Productivity and delays assessment for concrete batch plant-truck mixer operations. Construction Management and Economics, 23(08), 839-50.